change order of threads in blackboard learn

by Marcelino King 4 min read

How do I reorder discussions in Blackboard?

Navigate to the Blackboard discussion forum(s). Hover your mouse cursor over the left side the forum you wish to move. A cross-hair cursor will appear. Left click, hold, and drag the forum up or down to be in the appropriate position.Jul 24, 2013

Can you edit threads in Blackboard?

Edit a thread Open a forum and select a thread. On the thread's page, point to a post so that all of the functions appear and select Edit. The editor appears. Make edits while you view the original post.

How do you edit a discussion thread on blackboard?

Edit or delete repliesOpen a thread in a forum.On the thread's page, point to a post to view the available functions.Select Edit or Delete. The delete action is irreversible. ... When you edit, the page expands so that you can make edits in the editor while you view the original post.Select Submit.

Can you edit a thread on Blackboard as a student?

Students can delete only their own discussions, responses, and replies. Students can't edit their discussion titles after they create discussions. Open the menu for a response or reply to access the Edit and Delete functions. If you delete an initial response, all replies remain.

How do you create a thread on blackboard?

Start a Thread in a Discussion BoardOpen Blackboard and navigate to a course with a discussion board.Click the Discussion Board link from the navigation menu.Click the link for the forum you want to start a new thread in.Click Create Thread. ... Enter a Subject and Message for your thread.

Can a student delete a submission on blackboard?

Once a file has been successfully submitted to an assignments, you can't delete it. However, if you have the ability to make another submission, re-submit the file …Nov 2, 2020

Can you delete a discussion thread on Blackboard as a student?

Open the forum. Click the top left checkbox to select all the threads. Optional: Uncheck any message to be kept. Click Delete to remove the student posts.

How do you start a discussion reply?

There are three main ways to respond constructively to a post: “No, because...” • “Yes, and…” • “Yes, but...” If you disagree with someone's post, show that you appreciate that your classmate has an opinion, even if it's different from your own.

How do I edit a forum?

Editing ForumsClick the forum's Action Link to access the contextual menu.Select Edit.On the Edit Forum page, edit the forum Name and give the forum a description.Edit the Forum Availability.Edit the Forum Settings.Click Submit.

What does the green check mark mean on blackboard?

Problem is, when you go to Blackboard Grade Center, there's this weird green checkmark next to your Total column which designates that column as the “External Grade.” I have no idea what that actually means, but for our purposes, what this means is that you can't delete the Total column until you designate some other ...Dec 30, 2014

What does collapse all mean on blackboard?

Select Collapse to minimize a post and increase the vertical screen space. If your instructor enabled the rate posts feature in a forum's settings, Overall Rating displays the average rating for a post. When you point to the rating area, it changes to show Your Rating.

Can you edit a discussion post on canvas?

f your instructor allows, you can edit and delete your own Discussion posts. If the edit or delete option does not appear, your instructor has restricted this setting in your course. Each of your posts have a settings icon with edit and delete options.